ATL1 Atlanta Data Center Campus

Address 375 Riverside Parkway, Lithia Springs, GA, USA Space
Open Time Power
Owner Cyxtera Air conditioning & Cooling
Contact +1 866-403-5001 ,colo.support@cyxtera.com Standards
Data Center Introduction

Cyxtera: ATL1 Atlanta Data Center Campus

Cyxtera ATL1 Atlanta Data Center Campus is located at 375 Riverside Parkway, Lithia Springs, GA, USA. The data center is 86005 sqft. There is a total of 30000 sqft in raised floor space for colocation. It has access to 6.8 MW of power. We found 46 data center locations within 50 miles of this facility. Certifications for this location include PCI-DSS, ISO 27001, NIST 800-53, SSAE-18, HIPAA, SSAE-16 Type 1, SOC 2 Type 2, SOC 1, SOC 2, SOC 2 Type 1, SSAE-16 Type 2, SOC 1 Type 2.

Located in Lithia Springs, GA, the ATL1 data center campus continues to grow with a 3.6 MW expansion in the summer 2019. ATL1 is a single-story, purpose-built data center. The campus is conveniently located 15 minutes from Hartsfield Atlanta International Airport (ATL) and 20 minutes from downtown Atlanta. Less than a mile from Google’s data center, the site is outside of the 300-year flood zone. 

Highlights
  • Energy Star Certified data center with over 80,000 sq/ft raised floor space and access to 6.3 MW of utility power
  • Ballistic glass and walls at entrance, with tilt up concrete construction
  • Access to the industry’s only on-demand colocation platform, CXD
  • Customer community of 90+ media companies, software companies and other large global enterprises
  • Compliance with SSAE18, SOC-1, SOC-2, ISO 27001, PCI DSS, and NIST 800-53PE standards
  • HIPAA aligned
  • Connectivity to 8 unique network service providers and growing community of service providers
  • Solution deployment options include individual Secure Cabinets and dedicated Secure Cages


Amenities
  • Free secure Wi-Fi
  • Break room
  • Food and beverage vending machines
  • Crash carts and loaner tools
  • Work kiosks
  • Conference room
Technical Specifications

Utility Power 6.3 MW

UPS Capacity 4.0 MW

UPS Configuration N+1

Generator Capacity 11.25 MW

Generator Configuration N+1

Fuel Capacity 35,000 Gal.

Cooling Configuration N+1

Cooling Capacity 1,400 Tons

Carriers

AT&T
CenturyLink
Cogent
Comcast
Fiberlight
Level 3
Megaport
Zayo






Security
24x7 video surveillance, 90-day video storage, Two-factor authentication required to access, Biometric scanners + badge readers, Entrance mantraps, Ballistic paneling in lobby, Bulletproof glass
Fire Protection
VESDA provides early warning detection, Pre-action dry pipe sprinkler system