Home >DC> Search Result

LHR2 Docklands Data Center Campus

Address 7 Greenwich View, London, UK Space
Open Time Power
Owner Cyxtera Air conditioning & Cooling
Contact +1 866-403-5001 ,colo.support@cyxtera.com Standards
Data Center Introduction

Cyxtera: LHR2 Docklands Data Center Campus

Cyxtera LHR2 Docklands Data Center Campus is located at 7 Greenwich View, London, UK. The data center is 60000 sqft. There is a total of 60000 sqft in raised floor space for colocation. It has access to 2.7 MW of power. We found 99 data center locations within 50 miles of this facility. Certifications for this location include PCI-DSS, ISAE-3402, ISO 27001, SSAE-18, SSAE-16 Type 1, SOC 2 Type 2, SOC 1, SOC 2, SOC 2 Type 1, SSAE-16 Type 2, SOC 1 Type 2.

Docklands Data Center Campus LHR2

The Cyxtera Docklands campus is situated in the heart of the Docklands Financial District, 15 minutes from Central London, 17 minutes from London City Airport with easy access to public transit. 

The campus sits outside airport flight paths and away from all COMAH sites, minimizing the potential impact of hazards. LHR2 is a two-story steel frame and metal clad building offering colocation, interconnection services and on-site office space to support your IT infrastructure needs. 

Highlights
  • Nearly 20,000 sqm of data centre technical space with access to 31 MW of utility power
  • Customer community of over 160+ financial services firms, media companies, software companies and other large global enterprises
  • Access to the industry’s only on-demand colocation platform, CXD
  • High availability backed by 100% power uptime SLA
  • Nutanix Xi Cloud, including Xi Leap DRaaS, available in the London metro region
  • Compliance with SSAE18, SOC-1, SOC-2, ISO 27001, and PCI DSS standards
  • Connectivity to 16 unique network service providers via carrier neutral interconnection areas
  • Solution deployment options include individual Secure Cabinets and dedicated Secure Cages


Amenities
  • Free secure Wi-Fi
  • Break room
  • Food and beverage vending machines
  • Crash carts and loaner tools
  • Work kiosks
  • Conference room
Technical Specifications

Utility Power 2.7 MW

UPS Capacity 2.0 MW

UPS Configuration 2N

Generator Capacity 4.8 MW

Generator Configuration N+1

Fuel Capacity 46,000 Liters

Cooling Configuration  N+1

Cooling Capacity 530 Tons

Carriers

BT
CenturyLink
Colt
Eunetworks
Zayo



Security
24x7 video surveillance, 90-day video storage, Two-factor authentication required to access, Biometric scanners + badge readers, Entrance mantraps, Ballistic paneling in lobby, Bulletproof glass
Fire Protection
VESDA provides early warning detection, FM200 Gas Suppression
More