FRA2 Frankfurt Data Centre Campus

Address Hanauer Landstraße 7, Frankfurt, Germany Space
Open Time Power
Owner Cyxtera Air conditioning & Cooling
Contact +1 866-403-5001 ,colo.support@cyxtera.com Standards
Data Center Introduction

Cyxtera: FRA2 Frankfurt Data Centre Campus

Cyxtera FRA2 Frankfurt Data Centre Campus is located at Hanauer Landstraße 7, Frankfurt, Germany. The data center is 1200 sqft. There is a total of 1200 sqft in raised floor space for colocation. It has access to 3 MW of power. We found 58 data center locations within 50 miles of this facility. Certifications for this location include PCI-DSS, ISAE-3402, ISO 27001, SSAE-18, HIPAA, SSAE-16 Type 1, SOC 2 Type 2, SOC 1, SOC 2, SOC 2 Type 1, SSAE-16 Type 2, SOC 1 Type 2.

Frankfurt Data Centre Campus FRA2

The Frankfurt FRA2 data centre is Cyxtera's newest European facility.  It is housed in a three-story building located within an established data centre hub. 

The data centre provides enterprises and finance institutions with scalable colocation solutions and access to leading cloud and managed service providers. The campus features complete redundancy, financial grade standard and incremental multi-tier security measures.

The facility is located 15 minutes from Frankfurt International Airport and 7 km from downtown Frankfurt. FRA2 is approximately 11 km from our smaller FRA1 facility.

Highlights
  • 400 sqm of data centre with access to 1.5 MW of utility power
  • Connectivity to hundreds network service providers via carrier hotel within the same building
  • High availability deployment options include individual Secure Cabinets and dedicated Secure Cages backed by 100% power uptime SLA
  • Compliance with SSAE18, SOC-1, SOC-2, ISO 27001, and PCI DSS standards


Amenities
  • Free secure Wi-Fi
  • Break room
  • Food and beverage vending machines
  • Crash carts and loaner tools
  • Work kiosks
  • Conference room
Technical Specifications

Utility Power 3.0 MW

UPS Capacity 3.0 MW

UPS Configuration N+1

Generator Capacity 4.4 MW

Generator Configuration N+1

Fuel Capacity > 24 hours run-time at full load

Cooling Configuration N+1

Cooling Capacity 853 Tons

Carriers

euNetworks
Level3
Colt
Verizon
Gasline





Fire Protection
VESDA provides early warning detection, Argonite Gas Suppression
Support Services
Gold Support (remote hands), Structured Cabling